PROJECTS HANDED OVER BY THE MINISTRY OF WORKS AND ...
The Uganda Road Fund allocation was reduced to UGX 11.46Bn, while Central Government allocation was reduced by UGX 17Bn which was committed to prior contracts that Ministry of Works and Transport had signed for various Kampala roads as is in the resource file.
此資料沒有可用的檢視
其他資訊
欄位 | 值 |
---|---|
最後更新 | 七月 10, 2014 |
建立 | 七月 10, 2014 |
格式 | text/csv |
授權 | License not specified |
created | 超過 10 年之前 |
format | .csv |
hash | 40010154b224e0283b8336f155379c02186cd9d8 |
id | 194bfad3-782d-49c8-b36a-257420e9fa6b |
last modified | 超過 10 年之前 |
mimetype | text/csv |
on same domain | 1 |
package id | f4fd39b7-8e9d-4b40-a4b3-3ee2d96564b6 |
position | 4 |
revision id | ad75b092-a240-42c9-934c-2da48b47cbb4 |
size | 1.8 KiB |
state | active |
url type | upload |