Government Allocation by Sector for FY 2012/13
根據資料集摘要
Upgrading of Phase I and Phase II drainage Black Spots was contracted at a cost of UGX 4.0Bn and UGX 1.27Bn respectively. The supervision contract for these works will cost UGX 263 million.
來源:MINISTERIAL POLICY STATEMENT VOTE 122 KAMPALA CAPITAL CITY AUTHORITY FY 2012/13
此資料沒有可用的檢視
其他資訊
欄位 | 值 |
---|---|
最後更新 | 七月 14, 2014 |
建立 | 七月 9, 2014 |
格式 | text/csv |
授權 | License not specified |
created | 超過 10 年之前 |
format | .csv |
hash | 1bacaa5b7c52af258ee8ff00b30a2db0158eddff |
id | 1f84315a-a8ba-45bc-8d11-3b79c28f6e1d |
last modified | 超過 10 年之前 |
mimetype | text/csv |
on same domain | 1 |
package id | f4fd39b7-8e9d-4b40-a4b3-3ee2d96564b6 |
position | 1 |
revision id | edc560fd-5548-41b5-98dc-7ca5f242a2da |
size | 372 bytes |
state | active |
url type | upload |