ROAD WORKS IN NAKAWA DIVISION

URL: http://catalog.data.ug/dataset/f4fd39b7-8e9d-4b40-a4b3-3ee2d96564b6/resource/04f04f04-da38-4bfe-bee5-7f991ef8d452/download/roadworksinnakawadivision.csv

From the dataset abstract

Upgrading of Phase I and Phase II drainage Black Spots was contracted at a cost of UGX 4.0Bn and UGX 1.27Bn respectively. The supervision contract for these works will cost UGX 263 million.